Sylvan Lake mi decided this year that it was time to start replacing their failing / out-dated seawalls along frontage they own on Sylvan Lake. The city decided to start their marine construction project with a new galvanized steel seawall along their 240 foot of frontage off Pontiac Dr. Using galvanized pilings, you are simply going to get the most durable seawall with a mouth dropping life-span. July 10th Seaside Seawalls started their marine construction by cutting the existing steel seawall below grade. Everything went smooth on this project. We had maybe a dozen concrete chunks just 2 foot below the sandline that we had to fish out. Other than that, everything went well and we completed the marine construction project within a good time frame of one week. The Seaside Seawalls team did what we do best; a plumb level, straight as an arrow, durable as you can get, quality seawall.